Mardin Kiziltepe Potable Water Facilities and Transmission Line

  • Client : General Directorate of State Hydraulic Works
  • Location : Mardin / Turkey
  • Scope of Work :

    • 34.000,77 m. length Ø1200 mm. diameter and 6.407,93 m lenght Ø1100 mm. diameter GRP pipe transmission lines
    • 5 Pump stations
    • Chlorination station
    • Construction of one 20.000 m³, 2 ea 1.500 m³ and 2 ea 500 m³ water tanks
    • Supply and installation of mechanical equipment
  • Start Date : 01.01.2006
  • Finish Date : 30.12.2010