Büyükcekmece Wastewater Tunnel
- Client : Istanbul Metropolitan Municipality
- Location : Istanbul / TURKEY
- Scope of Work :
- Tunnel construction with TBM (Tunnel Boring Machine) having Ø 2000 mm. internal diameter, pre-cast segmental lining as 1st and reinforced concrete lining as 2nd layer,
- Total length of tunnel between start and end points is 7844 meters.
- Shaft construction with 7,5 m. external diameter. (5 ea)
- Start Date : 02.10.2012
- Finish Date : 24.08.2016