Büyükcekmece Wastewater Tunnel

  • Client : Istanbul Metropolitan Municipality
  • Location : Istanbul / TURKEY
  • Scope of Work :
    • Tunnel construction with TBM (Tunnel Boring Machine) having Ø 2000 mm. internal diameter, pre-cast segmental lining as 1st and reinforced concrete lining as 2nd layer,
    • Total length of tunnel between start and end points is 7844 meters.
    • Shaft construction with 7,5 m. external diameter. (5 ea)
  • Start Date : 02.10.2012
  • Finish Date : 24.08.2016