Turkey - Greece Natural Gas Pipeline-Phase 2- Offshore Section

Client : Botas Petroleum Pipeline Corporation

Location : Canakkale / TURKEY

Construction of offshore section (Marmara sea crossing) of Turkey – Greece Natural Gas Pipeline. Total offshore length of the pipeline is 17km and 36” inch in diameter. All the operations carried out by a adjoining derric lay barge. Pipeline was laid at a maximum depth of 68m under sea. Besides, 330 m of pipeline was laid onshore.

Start Date : 01.11.2005

Finish Date : 15.07.2007