East Blacksea Natural Gas Pipeline Phase-3

Client : Botas Petroleum Pipeline Corporation

Location : Bayburt - Rize / TURKEY

Construction, installation and commissioning of ~115 kms 16” dia. Natural gas intercity distribution pipeline from Bayburt to Rize.

Besides the main pipeline, below items are realised:

  • 3 ea 16’’ line valves,
  • 1 ea 16’’ pig receiving station,
  • 1 ea 16’’ take-off valve,
  • 1 ea 8’’ take-off valve,
  •  Excavation & backfilling of 115 kms, 16’’ dia., pipeline, Railway, highway and river crossings through the line via micro-tunnelling method,
  • NDT tests, hydraulic pressure tests and cathodic protection

Start Date : 01.06.2005

Finish Date : 01.02.2008